Dear everyone,
I search for SIF in the forum and comming up with this page.
I have attach the capture for the SIF value for 45 degree branch.
Here are caesar II input
1. Input 1
From 100 To 110 DX= 2,000.000 mm.
SIF's & TEE's
Node 110 Reinforced Tee Sif(in)= 4.610 Sif(out)= 5.739
Pad= 9.530 mm
From 110 To 120 DX= 1,000.000 mm.
SIF's & TEE's
Node 110 Reinforced Tee Sif(in)= 4.610 Sif(out)= 5.739
Pad= 9.530 mm
From 110 To 500 DX= 1,100.000 mm. DZ= 1,100.000 mm.
SIF's & TEE's
Node 110 Reinforced Tee Sif(in)= 4.610 Sif(out)= 5.739
Pad= 9.530 mm
2.Input 2
From 100 To 110 DX= 2,000.000 mm.
PIPE
SIF's & TEE's
Node 110 Sif(in)= 4.610 Sif(out)= 5.739
-----------------------------------------------------------------------------
From 110 To 120 DX= 1,000.000 mm.
SIF's & TEE's
Node 110 Sif(in)= 4.610 Sif(out)= 5.739
-----------------------------------------------------------------------------
From 110 To 500 DX= 1,100.000 mm. DZ= 1,100.000 mm.
SIF's & TEE's
Node 110 Reinforced Tee Sif(in)= 4.610 Sif(out)= 5.739
Please take review and comment which one is correct.
Please noted that the input is from node 110 to node 500 for branch.The SIF(i) and SIF(o) still same or not when the input is from node 500 to node 110?
I am confusing about this.
Thanks