#30751 - 10/19/09 04:18 AM ptfe-lined
stressor88 Offline
Member

Registered: 10/19/09
Posts: 4
Loc: Philippines
good afternoon everyone!

i have a ptfe-lined carbon steel pipe.

1. how am i going to consider the material in the analysis? is it the same as choosing A106B (it is actually a ptfe-lined A106 B pipe) instead?
2. are there any special requirements in the analysis of this system.


(by the way, i have already read some of the threads here regarding lining... just clarifying if there are other effects instead of the additional weight)

thanks in advance!


Edited by stressor88 (10/19/09 04:29 AM)

Top
#30753 - 10/19/09 07:00 AM Re: ptfe-lined [Re: stressor88]
MoverZ Offline
Member

Registered: 11/22/06
Posts: 1195
Loc: Hants, UK
Just consider it as carbon steel pipe, apart from corrosion allowance and the obvious limit on temperature.


Edited by MoverZ (10/19/09 07:03 AM)
Edit Reason: text added.

Top



Moderator:  Denny_Thomas, uribejl 
Who's Online
0 registered (), 30 Guests and 0 Spiders online.
Key: Admin, Global Mod, Mod
May
Su M Tu W Th F Sa
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Forum Stats
12065 Members
14 Forums
16973 Topics
75151 Posts

Max Online: 303 @ 01/28/20 11:58 PM
Top Posters (30 Days)