Hello,
I am doing analysis of gas system having design temp around 100 degree C and install temp of 10 degree C.
When I check the nozzle loads, I don't get any allowable values from manufauturers since they are small company. Can I use an old style method that limits maximum stress at the nozzle to 6000 psi instead of WRC 107? This system is not too critical.
Please, advise your opinion about this old fashion, please?
Many thanks,