Dear All,
the operating temp 700 deg F
SLIDE VALVE installed between reactor riser pipe to regenerator stand pipe, the slide valve operated extension needs to HANGER support , the reason is length of extension is 1.8 meters ( no need to support the valve, it is already consider and system runing smoothly), as per slide valve manufacture need to support the extension assenbly.
this job is to install spring hanger for slide valve extension. please advise how to carried out analysis.
Do i need to model entire system inclding regenator (25 m height)& reactor (40m height?
please advise me
regards
pipehawk