We have to meet the requirement of Pipe Rack sway ( due to plastic deformation of pipe rack in seismic )in addition to the normal thermal and sustain requirements and inertial seismic and frequency to be 7 Hz,requirements.
Many places we have to remove guides or increase the guide gaps in order to reduce the support loads and equipment nozzle loads.
The frequency calculations, we have done by deleting all gaps in the guides (only for modal analysis), since with gaps the frequency was coming very low.
Is this approach right. To meet all the above requirements we did not find any other solution.
_________________________
rgu