EJs are designed keeping in view maximum installaton movements. It is always tried to limit these installation movements to minimum. As standard practice, EJ should not be pre-loaded other than these installation movement. In my opinion, the installation tolerances and clearances should not be modeled.
_________________________
Regards,
Sky of Stars
Piping Stress Engineer