Posted by: M.Mohammad
Stress Analysis Spesification - 12/19/10 12:43 PM
Hello Dears,
I work on a project. Its SPEC said for non-critical pipe use approximate method and defines it:
1- Guided cantilever method for "L" shaped pipe work.
2- Developed length method for two anchor piping system.
What is mean of these?
Thank,
I work on a project. Its SPEC said for non-critical pipe use approximate method and defines it:
1- Guided cantilever method for "L" shaped pipe work.
2- Developed length method for two anchor piping system.
What is mean of these?
Thank,