Analysis for Lifting of piping segment

Posted by: PanKh

Analysis for Lifting of piping segment - 05/08/14 08:07 AM

Kidnly help me in this regards. I need to do analysis of pipes for lifting the pipes already commissioned for placing Neoprene pad beneath them. I need help in following regards.
1. What will be the basis for evaluation of stresses?
2. Whether I need to check the expansion stresses?
3. How to simulate the said sceario in CII?

Code for design is B31.4 and we are planning to lift the segments around 50 m at a time for the continuos pipe run of 3-4 km.
Posted by: John Schmidt

Re: Analysis for Lifting of piping segment - 06/16/14 01:30 PM

I would model a displacement at the lift points and set the conditions for those that will exist at the time of the lift. Preferably cold and empty.
Posted by: PanKh

Re: Analysis for Lifting of piping segment - 10/29/14 11:10 PM

Thank you John.
I have followed the same approach for the same.