I have done the calculation choosing the loose flange option and considering as internal flange diameter the internal diameter at hub.
I have checked the report and modified by hand the B value in the Hd formula,infact I do not understand this step in the calculation report, shouldn't the Hd formula be:
0.785 * Bē * Peq
instead of
2 * b * Pi * G * m * P + .............
I have modiefied this, and assumed for the Hd instead of internal diameter at hub the internal diameter at socket.
I would like some comment about it, is it right??
Thank you
GPz