Still using CW 2014 & Project Manager (Upgrading soon).
I'm placing the FW as a weld component at the end of the pipe joined to a pipe from a different pipeline, so it's only associated to one of the sheets. The symbol shows up on the iso of that line, but not on the iso for the continuing line, so I don't think it's a problem with symbols. Hope that makes sense. Is there an iso switch for welds on continuing sheets?
_________________________
Whether you think you can or you think you can't, you're right.