one pipe is running at 20 metre height in pipe rack.so,i analysed with wind condition and forwarded the loads to structural people.but they are telling give the operating load only.don't give the loads with wind,because while doing structure design,we also considering wind load.
what i have to do?advice me.
_________________________
KUMARESAN