Hi,

Consider a pipe system that was stressed checked & have been built already. Now, the iso's have to be updated (as-built status) - and while going through the CII calc., it is discovered that the incorrect ca (corrosion allowance) was used previously. If the correct ca is now used, the system fails.
What recourse is there?

Waleed
_________________________
wpalmer