Dear all,
In my project, I was told to check the nozzle load for Skimmer tanks using WRC 297, which I had already checked with API 650 P.3. Since P.3 had been removed from the code, the vendor suggested to go ahead with WRC 297. My doubt is whether we need to consider Tank settlement in the piping because the WRC analysis fails for the system. Kindly advise.
Also it will be more appreciated if anyone could send me any calculation shortcuts (like excel worksheets) for API 650 Appendix P.2.
Regards