Dear Mr.Dave,
We have done the Pipeline Stress Analysis for MLV Control station in Caesar B31.4 2017 version for which the Stress are qualified for 87.5 %. If we do the Same model Analysis using 2016 version it is failing by 114 %. Kindly advise.
Awaiting for your reply.
Best Regards
K.RAJESH