Colleagues,
However, the installers are promising to install this line such that the two nozzles only see the weight of the piping spool.
I was wondering how the installer will assure zero loads during installation.
To my understanding, it’s practically not possible that you will have no load during installation when pipes are connected.
One thing which can be tried out (non-standard solution) is;
1. Try to model the equipment with springs.
2. Do consider the three cases such as when equipment is empty, when equipment is half filled and when equipment is fully filled to design the spring.
3. The weight at these three conditions will be different. Try to design the spring as per the above three condition (optimized it).
4. Remember to check the option for the spring as designed with cold load. And create a load cases where you have locked the spring during installation (no piping is connected) and unlocking when piping is connected.
Then insert all the connected pipes to the system. (keep remember to define the spring rate and loads as you were designed for zero loads cases manually)
Run the system and check the nozzle load.
Personally I am not really found of making the restrained free. I hope this help.
Any commnets are always welcome.
Regards,
R.K.