Hello,

I am performing an analysis with API 610. Some of the loads overtake the allowable loads, but if we take in consideration Annex F, the loads would be valid. My queston is if there is some way in Caesar II to apply Annex F in API 610 analysy?

Thanks!

Top
#57794 - 02/19/14 07:36 AM Re: Annex F - API 610 - Caesar II [Re: PabloC]
pooria1978 Offline
Member

Registered: 02/25/08
Posts: 264
Loc: Netherlands

Annex F calculations (for par.b and c) are done automatically in CII API610. you do not need to do anything particularly in order to get it done.

Top
#57796 - 02/19/14 08:29 AM Re: Annex F - API 610 - Caesar II [Re: PabloC]
Dave Diehl Offline
Member

Registered: 12/14/99
Posts: 2382
Loc: Houston, TX, USA
CAESAR II has two locations where API 610 can be used. Yes, the "outboard" processor from teh Main Menu provides the Annex F approach but the quick check check (in the piping input) does not.
_________________________
Dave Diehl

Top
#57800 - 02/19/14 09:23 AM Re: Annex F - API 610 - Caesar II [Re: PabloC]
PabloC Offline
Member

Registered: 02/03/14
Posts: 5
Loc: Spain
Thanks pooria1978 and Dave Diehl for your answers.The point is that "par. a" is not performed in the analysis. Maybe I am wrong and the right way to take in consideration "par. a" is setting value of "2" at input data, Factor for Table 4 Allowables.
In my analysis I have a load that is over 1 time of API 610 allowables loads, but less than 2 times, so I thought that when I ran the analysis with API 610 it would be ok, but it appears as "Failed" cause of that load higher than 1 time of allowables load.

I hope that I have explained correctly my doubt and that you can help me.

Thanks!

Top
#57801 - 02/19/14 09:50 AM Re: Annex F - API 610 - Caesar II [Re: PabloC]
Dave Diehl Offline
Member

Registered: 12/14/99
Posts: 2382
Loc: Houston, TX, USA
The nozzle check in the piping input only does "a". So I would stick with Table 4 (now Table 5 in the current API edition)limit. This is appropriate for checking individual nozzles. If you meet that limit, the nozzle is fine. If the loads are less than 2 times the limit, then go to the stand-alone processor to check the entire pump. Here you have all three checks (a, b & c). Now set the Table multiplier to 2.
Be aware that you must be permitted to go beyond the Table limits, teh purchaser must be aware of your action.
Chances are someone's going to complain about ANY pump load.
_________________________
Dave Diehl

Top
#57805 - 02/19/14 10:10 AM Re: Annex F - API 610 - Caesar II [Re: PabloC]
PabloC Offline
Member

Registered: 02/03/14
Posts: 5
Loc: Spain
Thanks Dave! I agree with you at all.
Anyway I would like to say something for a future version of Caesar II. In my opinion, user doesn´t have to set multiplier to 2 in stand-alone analysis (simply setting to 1), just Caesar II should tell "valid" if loads are less than 2 times (giving a warning that some loads are higher than 1) and tell "failed" if loads are higher than 2 times. That would collect the paragraphs a, b & c.

Take it just as a comment, not a complaint.
Thanks again for your help!

Top



Moderator:  Denny_Thomas, uribejl 
Who's Online
0 registered (), 31 Guests and 2 Spiders online.
Key: Admin, Global Mod, Mod
May
Su M Tu W Th F Sa
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Forum Stats
12065 Members
14 Forums
16973 Topics
75151 Posts

Max Online: 303 @ 01/28/20 11:58 PM
Top Posters (30 Days)