#53745 - 04/03/13 03:26 AM Stress Analysis of metalic hose pipe for bulk tranfer
Subhankar Offline
Member

Registered: 05/18/05
Posts: 31
Loc: Kuala Belait
Hi All,

Can anybody have any idea about stress analysis of very long synthetic rubber hose (with SS316 reinforcement )for bulk transfer from Boat to Topside wellhead platform ? Is it possibe to analyse ? as the hose will not transfer any force or moment through node to node.

Client is asking to evaluate the stresses and forces/moments that are experienced at the tie-in point when the hose in operation and at the stowage point when the hose is anchored at the mezzanine deck.
we have all process data for types of bulk transfer ( i.e for raw water, corrosion inhibitor, demulsifier,scale inhibitor).
If anyone have any guide line to design the hose, please share.(Attached file shows model snapsot of hose arrangement)


Attachments
Flexible Hose Pipe.pdf (322 downloads)

_________________________
S Koley

Top
#53757 - 04/03/13 07:42 AM Re: Stress Analysis of metalic hose pipe for bulk tranfer [Re: Subhankar]
Richard Ay Offline
Member

Registered: 12/13/99
Posts: 6226
Loc: Houston, Texas, USA
There are many post here on this topic. Use the "Search" function.
_________________________
Regards,
Richard Ay - Consultant

Top
#53768 - 04/03/13 06:35 PM Re: Stress Analysis of metalic hose pipe for bulk tranfer [Re: Subhankar]
Subhankar Offline
Member

Registered: 05/18/05
Posts: 31
Loc: Kuala Belait
Dear Richard,

I have searched the forum before posting this topic. Every where the topic is about a small lenght of hose connected between pipe and nozzle and the short answer is ...'do not model the hose..leave the pipe as free end'.
In my case this is almost 100 m of hose and have supports at different locations ( plesae refer attached pdf drawing). Client is asking to ensure that hose will not break or damage during filling operation or stowage condition.
During stwowage, water wave will hit the hose. how we can evaluate the hose based on this external loading. In case any assesment can be done by using Caesar, let me know please.
_________________________
S Koley

Top
#53784 - 04/04/13 08:28 AM Re: Stress Analysis of metalic hose pipe for bulk tranfer [Re: Subhankar]
Richard Ay Offline
Member

Registered: 12/13/99
Posts: 6226
Loc: Houston, Texas, USA
You cannot analyze a hose with a 3D-beam element, which is the only element CAESAR II uses.
_________________________
Regards,
Richard Ay - Consultant

Top
#53815 - 04/07/13 01:32 AM Re: Stress Analysis of metalic hose pipe for bulk tranfer [Re: Subhankar]
PKU Offline
Member

Registered: 08/18/06
Posts: 78
Loc: Aberdeen
What is the purpose of analysis? You should be calulating the supporting loads, loads at terminal points and finally the radius is maintained as advised by the manufacturer.
_________________________
PKU

Top



Moderator:  Denny_Thomas, uribejl 
Who's Online
0 registered (), 31 Guests and 0 Spiders online.
Key: Admin, Global Mod, Mod
May
Su M Tu W Th F Sa
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Forum Stats
12065 Members
14 Forums
16973 Topics
75151 Posts

Max Online: 303 @ 01/28/20 11:58 PM
Top Posters (30 Days)