#38719 - 10/29/10 12:04 AM settlements for piping
stress1698 Offline
Member

Registered: 11/22/08
Posts: 13
Loc: india
hi to all forum member

one of my project has settlement cases as below


Vessels to / from Pipe Rack Bents: 1/4”
Pumps to / from Pipe Rack Bents: 1/4”
Tanks to / from Pipe Rack Bents: 1/4”
Pump to Pump (similar loading) N/A
Pump under Yard Steel to Yard Steel N/A
Pumps to Tanks: 1/4”
Pumps to Pressure Vessels 1/4”
Pumps to Drums 1/4”

in which case we have to consider settlements---in primary or secondary

also i made some load cases,just check whether i did correctly OR NOT

L1 W (HGR)
L2 W+T1+P1 (HGR)
L3 WW+HP+H (HYD)
L4 W+T1+P1+H+D1(OPE)
L5 W+T2+P1+H+D1(OPE)
L6 W+T1+P1+H(OPE)
L7 W+T2+P1+H(OPE)
L8 W+T1+P1+F1+H (OPE) OPERATING CASE (FOR T1 USUALLY OPERATING)
L9 W+T2+P1+F1+H (OPE) OPERATING CASE (FOR T2 USUALLY OPERATING)
L10 W+P1+F1+H (SUS) COLD SUSTAINED CASE CHECK
L11 W+P1+D1+H (SUS) COLD SUSTAINED CASE CHECK FOR SETTELMENTS
L12 W+P1+H(SUS) COLD SUSTAINED CASE CHECK
L13 WNC+ H (SUS) WEIGHT-NO CONTENTS
L14 W+T2+P1+F1+H+WIN1 (OPE) (OPE) WIND +X DIRECTION (SOUTHERN WINDS)
L15 W+T2+P1+F1+H+WIN2 (OPE) (OPE) WIND -X DIRECTION (SOUTHERN WINDS)
L16 W+T2+P1+F1+H+WIN3 (OPE) (OPE) WIND +Z DIRECTION (SOUTHERN WINDS)
L17 W+T2+P1+F1+H+WIN4 (OPE) (OPE) WIND -Z DIRECTION (SOUTHERN WINDS)
L18 W+T2+P1+F1+H+U1 (OPE)
L19 W+T2+P1+F1+H+U2 (OPE)
L20 T1 (EXP)
L21 T2 (EXP)
L22 L14-L7(OCC)
L23 L15-L7(OCC)
L24 L16-L7(OCC)
L25 L17-L7(OCC)
L26 L18-L7(OCC)SEISMIC IN X DIRECTION, i.e. GX=.114g
L27 L19-L7(OCC)SEISMIC IN Z DIRECTION, i.e. GZ=.114g
L28 L8-L10(EXP)EXP CODE STRESS CHECK(T1)
L29 L9-L10(EXP)EXP CODE STRESS CHECK(T2)
L30 L22+L10(OCC)WIND CODE STRESS CHECK (SOUTH WINDS)
L31 L23+L10(OCC)WIND CODE STRESS CHECK (NORTH WINDS)
L32 L24+L10(OCC)WIND CODE STRESS CHECK (WEST WINDS)
L33 L25+L10(OCC)WIND CODE STRESS CHECK (EAST WINDS)
L34 L26+L10(OCC)SEISMIC CODE STRESS CHECK IN X DIRECTION
L35 L27+L10(OCC)SEISMIC CODE STRESS CHECK IN Z DIRECTION
L36 L8-L20(SUS)HOT SUSTAINED CHECK AT TEMP T1
L37 L9-L21(SUS)HOT SUSTAINED CHECK AT TEMP T2
L38 L4-L12(EXP)EXP CODE STRESS CHECK WITH SETTLEMENTS AT TEMP T1
L39 L5-L12(EXP)EXP CODE STRESS CHECK WITH SETTLEMENTS AT TEMP T2
L40 L4-L6(EXP)SECONDARY STRESS CHECK DUE TO SETTLE MENTS
L41 L5-L7(EXP)SECONDARY STRESS CHECK DUE TO SETTLE MENTS


WHERE
F1=CONCENTRATED FORCE
D1=DISPLACEMENT DUE TO SETTLEMENTS
T1=OPE TEMP
T2 = FLEX TEMP
P1 = DESIGN PRESSURE


in L38,L39 we are inluding T1,T2 AND SETTLEMENTS,Isnt it conservative approach

is above load cases are correct????


thanks in advance

_________________________
stressguy

Top
#38724 - 10/29/10 07:26 AM Re: settlements for piping [Re: stress1698]
stressguy81 Offline
Member

Registered: 07/03/08
Posts: 71
Loc: India
Hi,
Search forum for "Settlement" etc.
Most of ur query has been already discussed.

L36,L37 may not produce accurate results.
Read this following link.

http://65.57.255.42/ubbthreads/ubbthreads.php?ubb=showflat&Number=38602#Post38602

Load case L20,L21 may also not give proper result
Read the below link
http://65.57.255.42/ubbthreads/ubbthreads.php?ubb=showflat&Number=6556#Post6556

I don't find U3 and U4 defined, it would be necessary to define U3=-X seismic accln and U4=-Z seismic accln since the strain effect produced by U1 and U3 may not be the same.
L.. W+T2+P1+F1+H+U3 (OPE)
L.. W+T2+P1+F1+H+U4 (OPE) may be required to be defined and appropriate code case also.


load case L8-T9(EXP) is missing
Load case 40,41 may not be required as max temp. range with settlement is already covered.

In Load case L34, L35 combining seismic with F1 is like combining 2 upset condition which may not be required.

Load case
LXX L8-L6
L... LXX+L12
will also be required as a (SUS) chk.

Going back to your query,
L11 is a non code case combination.

Settlement is considered as secondary as its imposed strain on to the system.
Refer 319.2.1(c) in B31.3-2008


Hope this helps.

Thanks

Top
#38729 - 10/29/10 10:18 AM Re: settlements for piping [Re: stressguy81]
Jop Offline
Member

Registered: 12/12/05
Posts: 191
Loc: Florida, USA
"Settlement"
Vessels to / from Pipe Rack Bents: 1/4”
Pumps to / from Pipe Rack Bents: 1/4”
Tanks to / from Pipe Rack Bents: 1/4”
Pumps to Tanks: 1/4”
Pumps to Pressure Vessels 1/4”
Pumps to Drums 1/4”

That's all! You really have got to be kidding!
How lucky can you be?
_________________________
Jop

Top



Moderator:  Denny_Thomas, uribejl 
Who's Online
0 registered (), 37 Guests and 0 Spiders online.
Key: Admin, Global Mod, Mod
May
Su M Tu W Th F Sa
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Forum Stats
12065 Members
14 Forums
16973 Topics
75151 Posts

Max Online: 303 @ 01/28/20 11:58 PM
Top Posters (30 Days)