a good day to all,
i want to confirm if this is right regarding my load case, i put wnc on load case and i assigned operating condition? because in my piping configuration during operating condition the force that act on pump nozzle exceed the allowable, so my senior stress engineer told me to delete a support that cause over load on pumup nozzle, i delete a support that cause the over load then the force result is lower than the allowable. but i'm curious about the supporting in piping configuration becuase it seams not stable, so i evaluate the configuration in wnc case and then the result exceed the allowable. is thier anyone can clarify this matter.
thank you
regards,
junmar