#10359 - 03/19/07 11:09 AM Stressful Accounting: Spilling the beans
Ken A. Nisly-Nagele Offline
Member

Registered: 09/07/05
Posts: 85
Loc: Greater Cincinnati IN/OH/KY, U...
Project description for first poll: A total of 600 hours ($60,000) was invested in flexibility analysis from initial concept through construction administration on a project consisting of 8 piping systems totaling 1200 elements, and 260 load cases.

B31.1 as basis of design, Grade B carbon steel, in heated building, 250 to 350 Deg. F, 150 to 400 psig, pipe sizes ranged from 4” to 24”, with the majority in the 4 to 8” range, with 8 pressure vessel nozzles, 12 pump nozzles. No flange leak checks, low thermal cycles, no seismic or other dynamic loads. Restraints consisted of one-way supports and spring hangers. No expansion joints or ball joints. No structural steel modeling or nozzle modeling. No analysis report to client. No as-built model.
What is your impression of the level of effort for the project description provided?
Only one choice allowed


Votes accepted starting: 03/19/07 11:05 AM
You must vote before you can view the results of this poll.
What pricing methods do you use?
Only one choice allowed


Votes accepted starting: 03/19/07 11:08 AM
You must vote before you can view the results of this poll.
_________________________
Ken

Top
#10361 - 03/19/07 12:59 PM Re: Stressful Accounting: Spilling the beans [Re: Ken A. Nisly-Nagele]
John C. Luf Offline
Member

Registered: 03/25/02
Posts: 1110
Loc: U.S.A.
Usually in a full blown project entailing piping layout, design, fab isos, pipe supports etc. an approximation is ~ 25-30% of the piping total.....
_________________________
Best Regards,

John C. Luf

Top
#10370 - 03/20/07 06:42 AM Re: Stressful Accounting: Spilling the beans [Re: John C. Luf]
Ken A. Nisly-Nagele Offline
Member

Registered: 09/07/05
Posts: 85
Loc: Greater Cincinnati IN/OH/KY, U...
I understand you to say flexibility analysis may run 25-30% of the total piping engineering cost. So, in terms of the installed cost of the piping around 3 to 5%?
_________________________
Ken

Top
#10378 - 03/20/07 02:06 PM Re: Stressful Accounting: Spilling the beans [Re: Ken A. Nisly-Nagele]
John C. Luf Offline
Member

Registered: 03/25/02
Posts: 1110
Loc: U.S.A.
25-30% of the total pipe design / engineering effort, where you are doing a 3D model, Isos, Pipe Supports etc.

The figure for percentage of construction cost to engineering cost varies widely but is around 15% - 20% of the total construction cost usually, this perecnetage is for all the engineering i.e., Civil Structural, Controls electrical etc.


Edited by John C. Luf (03/20/07 02:11 PM)
_________________________
Best Regards,

John C. Luf

Top



Moderator:  Denny_Thomas, uribejl 
Who's Online
0 registered (), 39 Guests and 0 Spiders online.
Key: Admin, Global Mod, Mod
May
Su M Tu W Th F Sa
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Forum Stats
12065 Members
14 Forums
16973 Topics
75151 Posts

Max Online: 303 @ 01/28/20 11:58 PM
Top Posters (30 Days)