Sir,
We,too, depend on visual inspection of piping only in the case of least stress criticality.
By a system walk-down or squad check on piping fabrication isometric, it is assessed whether properly piping specification, layout and supporting have been carried out and the findings are recorded and correcting measures,if any are carried out.
Nowadays, we are facing lack of thinking capability in stress analysts; divergence - broadening the possibilities followed by convergence - narrowing the possibilities is not really attractive enough to one fully submerged in the tunes of ipod or mobile phone. Many act in seconds, filling up a long check-list without thinking at all!
regards,
sam
_________________________
_